/ Jump the "circular" building /

> THE PROJECT

New mixed-use hotel and office building

> PERFORMANCE

HQE BD: Excellent (Offices)
BREEAM NC: Excellent (Offices) and Very Good (Hotel)
E+C-: E2C1 (Offices)
BBCA New: Performance (Offices)

> OUR MISSION

Project Management and Environmental Engineering Firm
Reuse Engineering Firm
Urban Ecology Engineering Firm
Project Management for Commissioning

> PHASE

Delivery in 2023

> PROJECT OWNER

Icade

> ARCHITECT

KAAN

> KEY FIGURES

15,000 m² of office space
3,000 m² of hotel space

> LOCATION

Aubervilliers
Place du Front Populaire

Key Takeaways!

Commissioning
Geothermal Energy
Mixed-Use Hotel and Office Building

OUR INVOLVEMENT

Sinteo led the energy strategy for this building complex, which consists of a hotel and an office building.

The building uses a new geothermal technology that works by storing and drawing energy from the ground based on the site’s usage. The variety of uses on the site facilitates heat transfer as needed.

This technology, which has been in place since the design phase, along with other considerations related to environmental performance, maintainability, and comfort, was taken into account early on to ensure greater operational success.

We carried out commissioning throughout the construction phase and participated in the start-up and acceptance of all technical packages for the project.

At the heart of the ecosystem in Aix

In a large tertiary park adjacent to a natural area, a redevelopment project was undertaken as the prime contractor for green spaces to promote permeability and natural breakthroughs up to the building foundations.

Read more »