Commissioning

Commissioning ensures the long-term performance of new or renovated facilities.

Our mission is to optimize the design, energy efficiency, user comfort, and operation of the building.

Guillaume Ruppel

Commissioning Business Manager CBCP® – Energy and Environmental Efficiency

The Challenges

Between the initial design sketch and the final handover of the building, numerous obstacles and constraints often arise throughout the construction process, leading to a degradation of expected performance. The outcome is clear: widespread disappointment among buyers who do not receive the building promised at the project's inception.

The Commissioning approach offers a solution to this challenge, as it aims to maintain the initial performance level and proactively address operational and maintenance issues.

The commissioning process commences during the project's programming phase (for new builds or renovations) and extends through to the operational handover, also encompassing support during the initial years of operation. This enables:

  • To anticipate operational and maintenance needs,
  • To validate the consistency of technical choices,
  • To integrate appropriate monitoring tools (comfort, consumption),
  • To prevent performance deviations from the moment of handover.

By ensuring enhanced long-term sustainability and durability of installations, it reduces their overall operating cost, minimizes breakdown risks, and contributes to the long-term value enhancement of real estate assets.

Our Solutions

Depending on the requirements, we deploy our qualified engineers holding CBCP (Certified Building Commissioning Professional) certification to support project owners across various building typologies (offices, hospitality, collective housing, public institutions, etc.) and throughout all stages of a building's construction/renovation:

Design

  • Support teams during the design phase
  • Anticipate potential operational and usage issues
  • Optimize building maintenance and operation
  • Optimize future operating costs
  • Definition of performance objectives and monitoring during design

Site Supervision

  • Support teams during the construction phase
  • Conduct commissioning workshops throughout the construction phase
  • Participate in site meetings
  • Validation of technical choices or variants

Handover

  • Tests and trials upon work handover
  • Participation in Pre-Handover Operations
  • Support for certification audits (HQE, BREEAM)

Knowledge Transfer

  • Ensure that construction teams provide the necessary technical knowledge to those responsible for operation.
  • Analysis of operational documents (DOE, DUEM, DIUO)
  • Participation in and facilitation of training for future operators
  • Support for the handover of operational contracts (multi-technical maintenance, cleaning, green space maintenance, waste management)

Operational Commissioning

  • Performance tests during the first years of operation
  • Monitoring of consumption and maintenance quality
  • Satisfaction interviews and surveys with users and operators

Guarantee of energy and environmental performance

  • Monitoring of performance commitments
  • Energy Performance Contract (EPC)
  • Assessment according to IPMVP methodology
  • Monitoring of operating teams

Recommissioning and retro-commissioning

  • Optimization of existing systems
  • Improvement of energy performance
  • In-depth evaluation, functional testing, performance measurements, followed by the implementation of practical corrective actions without requiring major renovations.

Our conviction:
with or without certification, a project
can always be ambitious

Our References

Commissioning for Achieving Actual Energy Performance

Based on lessons learned from highly informative programs like PREBAT, we now have sufficient perspective to state that selecting theoretically high-performing technical equipment does not guarantee future operational performance.

Malesherbes – Rehabilitation

For this elegant project located on Boulevard Malesherbes in Paris, we interpret the client's expectations

Geothermal Storage and Extraction in Aubervilliers

We manage the energy strategy for this building complex, comprising a hotel and an office building. The building utilizes a novel geothermal technology designed to store and draw energy from the ground based on the site's usage.

Workshops & Training

The Construction Fresk

An engaging and collaborative workshop focused on construction, designed to address the challenges of climate change.

The Climate Fresk

In just 3 hours, The Climate Fresk enables participants to grasp climate challenges and collectively transition to action.

2 Tonnes

2 tonnes represents the average carbon footprint per inhabitant that we should achieve by 2050. How can this be achieved?

To Learn More

Tertiary Decree and Real Estate Asset Management: Complying with the First Deadline and Integrating This New Regulatory Requirement into Asset Management

The 2021 deadline has been simplified, but it is approaching!

By September 30, 2021, tertiary buildings with a floor area exceeding 1,000m² must have met the first deadline of the Tertiary Eco-Energy Scheme (DEET – formerly the Tertiary Decree), specifically their initialization on the government platform OPERAT. The selection of the reference period is no longer required, having been postponed until September 2022 at the latest.

Read more »