/ User-Centric Rehabilitation /

> THE PROJECT

Redevelopment of an Office Building

> OUR MISSION

Owner's Representative and Environmental Engineering Consultant,

Commissioning,

MEP Engineering Consultant for Connectivity

> PROJECT OWNER

> PROJECT MANAGEMENT

> PHASE

Delivered in late 2024

> PERFORMANCE

BREEAM IRFO 2015 Excellent Level

BBCA Renovation

Osmoz

WiredScore

SmartScore

Compliant with the Tertiary Decree (2030 objective -40%)

> KEY FIGURES

16,000 m² (G+7)

> LOCATION

46 Camille Desmoulins Street in Issy-les-Moulineaux (92)

User-Centric Rehabilitation

Key Takeaways!

Vegetation
User Comfort
Energy Performance

OUR INVOLVEMENT

User comfort and building connectivity are central to this renovation project.

The user experience is enhanced through numerous connected services that will be available, including click & collect concierge, bookings, and control of lighting, solar shading, and HVAC, etc.

Occupant comfort is also a central concern and will be enhanced through the provision of highly vegetated outdoor spaces, bright and flexible offices, and services such as a gym, coworking spaces, and a modern, welcoming cafeteria concept, etc.

At the heart of the ecosystem in Aix

In a large tertiary park adjacent to a natural area, a redevelopment project was undertaken as the prime contractor for green spaces to promote permeability and natural breakthroughs up to the building foundations.

Read more »